We are engaged in the design, installation and production of thermotechnical installations and plants (heating, cooling, air conditioning and ventilation)
MORE ABOUT USto our esteemed customers through designing and consulting with partners and paying particular attention to choosing the type and method of installation of the heating and ventilation system
fuels (peeled) are used in the German factory Leoni in Prokuplje and for the first significant heating and ventilation system of this type in Serbia proved to be an excellent investment
has contributed to the advancement of activity as a recommendation to the largest foreign investors in the country, such as Fiat, Leoni,Actavis ...
over 50 workers in the mechanical installations sector, among which there are 8 engineers who improve their enormous experience and knowledge every day at construction sites throughout Serbia
ČIP LTD is a private company for the design, installation and production of
thermomechanical installations and plants (heating, cooling, air conditioning and
ventilation) that defines the policy of the integrated management system in order
to ensure the conditions for products and services to fulfil the stated and unsaid real
requirements of users and applicable laws, standards and other regulations through
the functioning of integrated management systems (quality management systems,
environmental management systems and health and safety management systems,
and safety at work).
The policy is realized using the following principles:
- Leadership management organizes and performs all processes in a manner that
ensures improvement of their efficiency and effectiveness, environmental protection
and health and safety at work, and rationally refers to energy efficiency,
- Employees are our most valuable resource and we pay special attention to
improving the level of their knowledge and completeness through training and
professional development, developing their awareness of the importance of
functioning of integrated management systems,
- Consultation and participation of workers is the basis of all activities that
concern on improvement of working conditions,
- Implementation of beneficial communications in order to establish a
partnership with all interested parties in order to exchange information relevant to
our products and services, environmental protection, health and safety at work and
efficient use and energy consumption,
- Tracking global trends in terms of modernizing business and applying them to
keep existing and open up new markets,
- Reduce operating costs, increase efficiency and profitability.
- Preventive action aimed at rational use of natural resources, prevention of
pollution by proper disposal of waste with activities of continuous improvement of
environmental protection,
- Permanent commitment to security of facilities and healthy and safe
workplaces that aim at the zero level of risk for employees and all in the
environment.
Permanent commitment to security of facilities and healthy and safe
workplaces that aim at the zero level of risk for employees and all in the
environment.
Fiat cars Serbia, FAS | Main boiler room, station, 180MW | All mechanical installations, DHW |
Fiat cars Serbia, FAS | Main compressor station, 2.5MW | HVAC installations |
Fiat cars Serbia, FAS | Main warehouse, 2MW | HVAC installations |
Fiat cars Serbia, FAS | Production halls 110.000 m² | HVAC installations |
Coopertires | Production hall, 18.000m² | Installation of steam, compressed air, vacuum and water |
Coopertires | Installation of vulcanization presses | Assembly of production presses and thermotechnical installations |
Leoni Malosiste | New production hall 24.000m² | Complete air conditioning |
Leoni Prokuplje | A production hall of 8,000 m² and accompanying facilities | Heating installation and boiler rooms |
Leoni Prokuplje | Production hall of 6,000 m² and accompanying facilities | Complete air conditioning |
Leoni Prokuplje | Production hall no. 3 1.000 m² and accompanying facilities | Complete air conditioning |
Leoni Prokuplje | Production lines, various machines | Manufacture and installation |
Henkel, Krusevac | Installation of equipment and energy fluids on the line of beef pellets | Inhalation of DHW, cold water, compressed air, sodium sulfate |
Tigartyres, Pirot | Installation of equipment and energy fluids in the new roller | Installation of DHW, cold water, process oil |
Gradina, Belgrade | Hydroelectric Power plant 275kW | Pipeline Ø600, length 2200m, construction and installation of water supply equipment and turbine part |
Tigartyres, Pirot | Installation of equipment and energy fluids | Installation of DHW, cold water, compressed air |
Gradina, Belgrade | Hydro Power Plant Saince Power 315kW | Hydro Power Plant Saince Power 315kW |
Planinka Ltd, Kuršumlija | Hotel Radan, Prolom Banja | Boiler room (pellet boiler) 530kW, DHW DN80 400m |
Planinka Ltd, Kuršumlija | Hotel Kopaonik II in Lukovska Banja | Complete air conditioning |
Zdravlje Actavis, Leskovac | New production hall, works | Steam diversion 5bar, steam 3bar, cooling water 7/12 ° C, DHW 90/70 ° C, compressed air 7bar (prokron tube), home vacuum |
Zdravlje Actavis II phase, Leskovac | New production hall, works | Steam divider 5bar, steam 3bar, cooling water 7/12 ° C, DHW 90/70 ° C, compressed air 7bar (prokronske pipe), home vacuum |
Rumaguma-Galaxy, Ruma | New production hall, project | Steam distribution 22bar, steam 17.5, steam 13bar, steam 8bar, steam 5bar, boiling water 22bar, cooling water, hydraulic water, air heating and ventilation, local ventilation |
City heating plant, Nis | DHW | DHW, DN400, 300, 250, 200 |
Traco-Invest, Belgrade | Blok 20, Belgrade, Savograd | Installation of air conditioning |
Belville | University settlement, residential building SPO 5-2 | Heating installation, substation |
Mećavnik | Zlatibor | |
Bomex MB Presting, Belgrade | Television Košava, Belgrade | Installation of air conditioning in the studio |
Bomex MB Presting, Belgrade | Shopping Cener Usce, Belgrade | Installation of air conditionning |
NIS Petrol, Novi Sad |
BP Kladovo | Complete air conditioning |
AUTO MG Komerc | Iveco servis, new hall | Steel construction, panel covering |
Community Health centre, Kuršumlija | Community Health centre | Boiler room, DHW DHW, 200m |
Customs Administration, Belgrade | Administrative building in Nis | Boiler room, heating installation |
JU Bank | Branch Blace | Boiler room, heating installation |
DIN Nis | RJ Prokuplje | Ferm chamber for processing tobacco |
Customs Administration, Belgrade | Administrative building in Nis | Boiler room, heating installation |
Customs Administration, Belgrade | Administrative building in Vrska Cuka | Boiler room, heating installation |
Directorate of Prokuplje | Sport Hall, Prokuplje | DHW DN125 |
Galant Engineering | Residential building Niš, Todora Milovanovića/23 | Heating installation, substation |
Galant Engineering | Residential building Niš, Branka Miljkovića/76 | Heating installation |
Students' home, Prokuplje | Students' home, Prokuplje | Boiler room |
Technical Engineering Prokuplje | GP Vrška Čuka | Boiler room, heating installation |
Directorate of Prokuplje | Sport Hall, Prokuplje | Boiler room I phase |
Тranskop Svrljig | Gas pumpEnergogas Nis | Steel construction |
Health Center Toplica, Prokuplje | Scanner rooms | Air conditionning |
City heating plant Nis | DHW | DHW, DN150, 125, 100 |
City heating plant Nis | DHW | DHW, DN400, 300, 250, 200 |
Internal Clinic Nis | Upgraded part | Heating and air conditioning |
Super Market ČUTURA | Super Market | Ventilation and air conditioning |
Primary school N.S. Tatko, Prokuplje | DHW | DHW DN100 from Gymnasium to school and museum |
Gymnasium Prokuplje | DHW | DHW DN80 50m |
Kindergarten Neven, Prokuplje | DHW | Heating system DN80 165m |
General Hospital, Zajecar | main building, kitchen, infectious, neuropsychiatry, children's department | heating installation, steam divider 0.5bar |
Traco-Invest, Belgrade | Substations at faculties AEGF, Legal, Technological, Belgrade | Substations |
Brickyard Mladost, Mala Plana | Brickyard, Mala Plana | рDiversion of compressed air |
Traco-Invest, Belgrade | University settlement Belgrade, SPO 5-2 building | Heating installation, substation |
Projmetal, Belgrade | Department store, Smederevska Palanka | Installation of air conditioning |
Hydroelectric Power Station Djerdap | Overhaul hall | Project of heating and compressed air |
Failure will never overtake me if my determination to succeed is strong enough
What you do today may improve all your tommorows.
Knowing is not enough, we must apply. Willing is not enough, we must do.
Aim for the Moon, if you miss, you may hit a star.
A creative man is motivated by the desire to achieve, not by the desire to beat others.
DRAGOLJUBA RAKIĆA BB
PROKUPLJE