CIP LTD Prokuplje


We are engaged in the design, installation and production of thermotechnical installations and plants (heating, cooling, air conditioning and ventilation)

MORE ABOUT US

ABOUT US


We provide significant savings

to our esteemed customers through designing and consulting with partners and paying particular attention to choosing the type and method of installation of the heating and ventilation system

Bio-renewable

fuels (peeled) are used in the German factory Leoni in Prokuplje and for the first significant heating and ventilation system of this type in Serbia proved to be an excellent investment

The twenty-year experience

has contributed to the advancement of activity as a recommendation to the largest foreign investors in the country, such as Fiat, Leoni,Actavis ...

We employ

over 50 workers in the mechanical installations sector, among which there are 8 engineers who improve their enormous experience and knowledge every day at construction sites throughout Serbia

Integrated Management System Policy CIP LTD Prokuplje


ČIP LTD is a private company for the design, installation and production of thermomechanical installations and plants (heating, cooling, air conditioning and ventilation) that defines the policy of the integrated management system in order to ensure the conditions for products and services to fulfil the stated and unsaid real requirements of users and applicable laws, standards and other regulations through the functioning of integrated management systems (quality management systems, environmental management systems and health and safety management systems, and safety at work).

The policy is realized using the following principles:

- Leadership management organizes and performs all processes in a manner that ensures improvement of their efficiency and effectiveness, environmental protection and health and safety at work, and rationally refers to energy efficiency,

- Employees are our most valuable resource and we pay special attention to improving the level of their knowledge and completeness through training and professional development, developing their awareness of the importance of functioning of integrated management systems,

- Consultation and participation of workers is the basis of all activities that concern on improvement of working conditions,

- Implementation of beneficial communications in order to establish a partnership with all interested parties in order to exchange information relevant to our products and services, environmental protection, health and safety at work and efficient use and energy consumption,

- Tracking global trends in terms of modernizing business and applying them to keep existing and open up new markets,

- Reduce operating costs, increase efficiency and profitability.

- Preventive action aimed at rational use of natural resources, prevention of pollution by proper disposal of waste with activities of continuous improvement of environmental protection,

- Permanent commitment to security of facilities and healthy and safe workplaces that aim at the zero level of risk for employees and all in the environment.

Permanent commitment to security of facilities and healthy and safe workplaces that aim at the zero level of risk for employees and all in the environment.


November 2021., Prokuplje
Director:

Momčilo Čolović

REFERENCES


Fiat cars Serbia, FAS Main boiler room, station, 180MW All mechanical installations, DHW
Fiat cars Serbia, FAS Main compressor station, 2.5MW HVAC installations
Fiat cars Serbia, FAS Main warehouse, 2MW HVAC installations
Fiat cars Serbia, FAS Production halls 110.000 m² HVAC installations
Coopertires Production hall, 18.000m² Installation of steam, compressed air, vacuum and water
Coopertires Installation of vulcanization presses Assembly of production presses and thermotechnical installations
Leoni Malosiste New production hall 24.000m² Complete air conditioning
Leoni Prokuplje A production hall of 8,000 m² and accompanying facilities Heating installation and boiler rooms
Leoni Prokuplje Production hall of 6,000 m² and accompanying facilities Complete air conditioning
Leoni Prokuplje Production hall no. 3 1.000 m² and accompanying facilities Complete air conditioning
Leoni Prokuplje Production lines, various machines Manufacture and installation
Henkel, Krusevac Installation of equipment and energy fluids on the line of beef pellets Inhalation of DHW, cold water, compressed air, sodium sulfate
Tigartyres, Pirot Installation of equipment and energy fluids in the new roller Installation of DHW, cold water, process oil
Gradina, Belgrade Hydroelectric Power plant 275kW Pipeline Ø600, length 2200m, construction and installation of water supply equipment and turbine part
Tigartyres, Pirot Installation of equipment and energy fluids Installation of DHW, cold water, compressed air
Gradina, Belgrade Hydro Power Plant Saince Power 315kW Hydro Power Plant Saince Power 315kW
Planinka Ltd, Kuršumlija Hotel Radan, Prolom Banja Boiler room (pellet boiler) 530kW, DHW DN80 400m
Planinka Ltd, Kuršumlija Hotel Kopaonik II in Lukovska Banja Complete air conditioning
Zdravlje Actavis, Leskovac New production hall, works Steam diversion 5bar, steam 3bar, cooling water 7/12 ° C, DHW 90/70 ° C, compressed air 7bar (prokron tube), home vacuum
Zdravlje Actavis II phase, Leskovac New production hall, works Steam divider 5bar, steam 3bar, cooling water 7/12 ° C, DHW 90/70 ° C, compressed air 7bar (prokronske pipe), home vacuum
Rumaguma-Galaxy, Ruma New production hall, project Steam distribution 22bar, steam 17.5, steam 13bar, steam 8bar, steam 5bar, boiling water 22bar, cooling water, hydraulic water, air heating and ventilation, local ventilation
City heating plant, Nis DHW DHW, DN400, 300, 250, 200
Traco-Invest, Belgrade Blok 20, Belgrade, Savograd Installation of air conditioning
Belville University settlement, residential building SPO 5-2 Heating installation, substation
Mećavnik Zlatibor
Bomex MB Presting, Belgrade Television Košava, Belgrade Installation of air conditioning in the studio
Bomex MB Presting, Belgrade Shopping Cener Usce, Belgrade Installation of air conditionning
NIS Petrol,
Novi Sad
BP Kladovo Complete air conditioning
AUTO MG Komerc Iveco servis, new hall Steel construction, panel covering
Community Health centre, Kuršumlija Community Health centre Boiler room, DHW DHW, 200m
Customs Administration, Belgrade Administrative building in Nis Boiler room, heating installation
JU Bank Branch Blace Boiler room, heating installation
DIN Nis RJ Prokuplje Ferm chamber for processing tobacco
Customs Administration, Belgrade Administrative building in Nis Boiler room, heating installation
Customs Administration, Belgrade Administrative building in Vrska Cuka Boiler room, heating installation
Directorate of Prokuplje Sport Hall, Prokuplje DHW DN125
Galant Engineering Residential building Niš, Todora Milovanovića/23 Heating installation, substation
Galant Engineering Residential building Niš, Branka Miljkovića/76 Heating installation
Students' home, Prokuplje Students' home, Prokuplje Boiler room
Technical Engineering Prokuplje GP Vrška Čuka Boiler room, heating installation
Directorate of Prokuplje Sport Hall, Prokuplje Boiler room I phase
Тranskop Svrljig Gas pumpEnergogas Nis Steel construction
Health Center Toplica, Prokuplje Scanner rooms Air conditionning
City heating plant Nis DHW DHW, DN150, 125, 100
City heating plant Nis DHW DHW, DN400, 300, 250, 200
Internal Clinic Nis Upgraded part Heating and air conditioning
Super Market ČUTURA Super Market Ventilation and air conditioning
Primary school N.S. Tatko, Prokuplje DHW DHW DN100 from Gymnasium to school and museum
Gymnasium Prokuplje DHW DHW DN80 50m
Kindergarten Neven, Prokuplje DHW Heating system DN80 165m
General Hospital, Zajecar main building, kitchen, infectious, neuropsychiatry, children's department heating installation, steam divider 0.5bar
Traco-Invest, Belgrade Substations at faculties AEGF, Legal, Technological, Belgrade Substations
Brickyard Mladost, Mala Plana Brickyard, Mala Plana рDiversion of compressed air
Traco-Invest, Belgrade University settlement Belgrade, SPO 5-2 building Heating installation, substation
Projmetal, Belgrade Department store, Smederevska Palanka Installation of air conditioning
Hydroelectric Power Station Djerdap Overhaul hall Project of heating and compressed air

Certificates


Gallery


Contact


  • +381 (27) 322.362
  • posao@cipprokuplje.rs , office@cipprokuplje.rs
  • Monday-Friday 7h – 15h
  • VAT number: 100952163
  • Company registration number: 06082157
  • SIC: 2825
  • Account: 170 - 0030014381000 - 39 UNICREDIT bank, 275 - 0010222097567-97 Societe Generale bank

Failure will never overtake me if my determination to succeed is strong enough

Og Mandino

What you do today may improve all your tommorows.

Ralph Marston

Knowing is not enough, we must apply. Willing is not enough, we must do.

Wolfgang von Goethe

Aim for the Moon, if you miss, you may hit a star.

W. Clement Stone

A creative man is motivated by the desire to achieve, not by the desire to beat others.

Ayn Rand

DRAGOLJUBA RAKIĆA BB
PROKUPLJE